Road: Amtali (AK High School) RHD- Gazipur GC Via Talukder Hat road.
Division: Barishal
District: BARGUNA
Upazila: Amtali
Length: 12.35 km
Climate Factors: Precipitation & Temperature
Road Category: Upazila Road
Surface Type: BC
Design Life (Surface, yrs): 20
Climate Design Horizon: 2032–2052
SSP Scenario: SSP5-8.5
Computed Resilience Scores
Metric
Precipitation
Temperature
AAR (%)
11.37
52.49
RSRO
5.9
9.04
RSRE
10
10
RSLE
7.92
7.92
RIB
7.94
8.48
FCC Class / Value
1 / 0.15
3 / 0.5
RICC
6.75
4.24
Final RICC:4.24(minimum of Precipitation & Temperature)
Climate Context
SSP Scenario: SSP5-8.5
Target Design-Horizon Year: 2052
Baseline Period: 1995–2014
AAR vs. Baseline:
Precip 11.37% ·
Temp 52.49%
SSP5-8.5 — Fossil-fuelled Development: a high-emissions pathway, roughly +4.4°C global mean warming by 2100 vs. pre-industrial levels.
Resilience Status:Medium
Resilience Degree is Medium
Recommended Actions
Upgrade
Enhanced maintenance and retrofit
Monitor and learn
AI Insight beta
AI-generated context to help interpret the actions above for this specific road. The RICC score and Low/Medium/High degree above remain the authoritative engineering result.