Back to Dashboard
Road Evaluation
Brief Report
Road Information
Road: Ilisha R H D (Parangonj Bazer)-Pagashia Bagar hat Rd.
Division: Barishal
District: BHOLA
Upazila: Bhola Sadar
Length: 6.50 km
Climate Factors: Precipitation & Temperature
Road Category: Upazila Road
Surface Type: BC
Design Life (Surface, yrs): 20
Climate Design Horizon: 2032–2052
SSP Scenario: SSP3-7.0
Computed Resilience Scores
Metric Precipitation Temperature
AAR (%)3.8221.23
RSRO6.326
RSRE00
RSLE6.676.67
RIB4.336.34
FCC Class / Value0 / 0.11 / 0.25
RICC 3.9 4.76
Final RICC: 3.9 (minimum of Precipitation & Temperature)
Climate Context
SSP Scenario: SSP3-7.0
Target Design-Horizon Year: 2052
Baseline Period: 1995–2014
AAR vs. Baseline: Precip 3.82% · Temp 21.23%
SSP3-7.0 — Regional Rivalry: a medium-to-high emissions pathway, roughly +3.6°C global mean warming by 2100 vs. pre-industrial levels.
Resilience Status: Medium
Resilience Degree is Medium
Recommended Actions
  • Upgrade
  • Enhanced maintenance and retrofit
  • Monitor and learn
AI Insight beta
AI-generated context to help interpret the actions above for this specific road. The RICC score and Low/Medium/High degree above remain the authoritative engineering result.
Generated
Road Location
Low Medium High
Back to Dashboard